Wednesday, December 8, 2010

December 8th 2010

Today we had a high temperature of 36 degrees Fahrenheit...

We put the final touches on the lazarette bulkhead, after having stripped (laminated thin wood strips together with epoxy) the frame in place.

We ground down the rest of the fasteners along the port side in the tank room, which awaits 6 new frames tomorrow.

I spent spent most of the day out on deck removing the screws and fender washers from the deck, and grinding off the glue blobs.  I have a bit of shaping to do to the rear deck.  The stern at the transom runs on a slightly different camber than the rest of the boat, from last falls repair.  We are getting ready for fiberglass on Friday.  Friday is supposed to be in the 50's, and with a heater down below deck we should have no problems fiberglassing the deck...  Though by no means a cake walk, as we'll be using fast hardener!

All for now,

Zach

No comments: