Saturday, October 3, 2015

September 2015

After a lot of sanding and priming, we have Awlgrip topcoat on the bead board.  The majority of the wiring is in place for the 110v circuits, and we are getting the lighting laid out.
We'll be switching gears to outdoors work now that it has cooled off.